Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
asec (Ramchandra Mogulla)
Observations/Finding
Summary
*
Upon request, our representative from AS Engineering and Consulting (ASEC) conducted a site visit to perform quality control inspection and testing services. Visual observation techniques were applied to verify compliance with project drawings/specifications, relevant codes, and materials submittals. The following observations were made during the site visit: <ol> <li>Test excavations were carried out near Lots #39, 40, 41, 43, and 45, totaling approximately 8 test pits. Rock was encountered at various depths as illustrated in the attached drawing. Surface rock was noted in several areas in the vicinity of these excavations.</li> <li>Some of the rock encountered in the top few feet was noted to be fractured and layered. Such rock should be manageable with mechanical means such as jack hammers.</li> <li>The depth of rock encountered varied among the excavations in close proximity. Additionally, large boulders were uncovered during grading operations, indicating a potential variation in the nature of rock across the site. The observed rock appears to be pinnacled, and its distribution does not seem to cover extensive areas.</li> <li>Due to the heterogeneous nature of rock encountered, it is challenging to accurately quantify its presence on the site. Large boulders, as suggested by visual observations, may necessitate specialized equipment for effective management. The use of conventional grading equipment might be inefficient, and methods such as jackhammers or explosive charges may be required to break down the rock into smaller, manageable pieces.</li> <li>Considering the potential complexity of rock management, a detailed assessment of the cost implications for the suggested processes (jackhammers or explosive charges) is recommended. The efficiency of these methods and the manpower required should also be evaluated for an informed decision.</li> </ol> We appreciate the opportunity to provide our services on this project. Should you have any inquiries or require further clarification on this report, please do not hesitate to contact us. We are at your disposal for any discussions regarding the observations outlined.
Upload Images
Image
Description
1
Boulders observed in previously graded areas
2
Layered and fractured rock observed in the top 4 feet of this excavation.
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel