Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C111(DOA Fiber Infrastructure Improvements )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Isaac Davis (Isaac Davis)
Observations/Finding
Summary
*
<strong>Density Report for Jobsite - RTR Fiber (Tower Duct Bank)</strong> <em>Project Overview:</em> The RTR Fiber jobsite, located between Mike 14 and Mike 12, is undergoing construction of a tower duct bank. The contractor for this project is BBH. The construction involves the excavation of a trench to an approximate depth of 4 feet, followed by the placement of a pre-cast duct bank designed for two-way 4-inch pipes. Each pre-cast duct bank segment measures roughly 1 foot in height and 10 feet in length. After placement, backfilling is done with an approximate 3 feet cover on top of the pre-cast duct bank. <em>Density Assessment:</em> The density report focuses on key elements such as trench excavation, pre-cast duct bank placement, backfilling, and preliminary test results. <strong>1. Trench Excavation:</strong> <ul> <li>Depth: The trench was excavated to an approximate depth of 4 feet.</li> <li>Quality: The excavation process aimed to meet the required specifications for the subsequent installation of the duct bank.</li> </ul> <strong>2. Pre-cast Duct Bank Installation:</strong> <ul> <li>Design: The pre-cast duct bank is designed to accommodate two-way 4-inch pipes.</li> <li>Dimensions: Each pre-cast duct bank segment measures approximately 1 foot in height and 10 feet in length.</li> <li>Placement: The duct bank segments were properly positioned within the excavated trench.</li> </ul> <strong>3. Backfilling:</strong> <ul> <li>Depth: Backfilling was performed with an approximate 3 feet cover on top of the pre-cast duct bank.</li> <li>Compaction: The backfilling process aimed to achieve proper compaction to ensure stability and support.</li> </ul> <strong>4. Preliminary Test Results (T1 and T2):</strong> <ul> <li><em>T1:</em> <ul> <li>WD (Wet Density): 108.3</li> <li>DD (Dry Density): 83.8</li> <li>M% (Moisture Content): 29.3%</li> </ul> </li> <li><em>T2:</em> <ul> <li>WD (Wet Density): 106.8</li> <li>DD (Dry Density): 81.8</li> <li>M% (Moisture Content): 30.6%</li> </ul> </li> </ul> <strong>5. Project Progress:</strong> <ul> <li>Approximately 200 feet of the duct bank has been completed.</li> </ul> <em>Observations:</em> <ul> <li>Trench excavation, pre-cast duct bank placement, and backfilling have been executed according to project specifications.</li> <li>Preliminary test results indicate density and moisture content, with further analysis pending the acquisition of the proctor.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel