Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C201 (draft)(Jasons Walk - Era Drive)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
The undersigned ASEC representative visited the site to observe the ongoing construction activities. The primary focus was on the backfilling of the trench, compaction testing, and the installation of new pipe sections. <h3>Trench Backfill and Compaction</h3> <ul> <li><strong>Activity Observed:</strong> Backfill of the trench for storm drain installation.</li> <li><strong>Method:</strong> The contractor backfilled the trench in 6 to 8-inch lifts.</li> <li><strong>Compaction Tests:</strong> Six compaction tests were performed to ensure compliance with project specifications.</li> <li><strong>Location:</strong> The area of backfill is shown in red on the attached site drawing.</li> </ul> <h3>Pipe Installation Progress</h3> <ul> <li><strong>Location:</strong> Stretching from Ava Court towards the intersection with Austin Michael Lane.</li> <li><strong>Activity Observed:</strong> Excavation and laying of new storm pipe sections.</li> <li><strong>Method:</strong> The contractor coordinated excavation and pipe laying operations.</li> <li><strong>Location:</strong> The area where the new pipe was being placed is shown in blue on the attached site drawing.</li> <li><strong>Compliance:</strong> All activities observed were in accordance with the project specifications and standards.</li> </ul> If you have any questions or require further clarification regarding the content of this report, please do not hesitate to get in touch. We are readily available to address any inquiries you may have. We appreciate the opportunity to contribute to the project.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel