Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C201 (draft)(Jasons Walk - Era Drive)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
The undersigned ASEC representative was on site as requested by the Contractor to observe storm drain and soil backfill placement. Visual observation techniques were employed to evaluate work in-place for general compliance with the Project Plans, Specifications, Codes and Standards, and Material Submittals. <h3>Soil Placement and Compaction</h3> <ul> <li><strong>Location:</strong> Lots #8, 9, and 10.</li> <li><strong>Activity Observed:</strong> Soil placement to final grade.</li> <li><strong>Compaction Tests:</strong> Conducted on each lot, with the results detailed below.</li> </ul> <h3>Storm Drain Placement</h3> <ul> <li><strong>Location:</strong> Along Ava Court, work area highlighted in blue on attached drawing.</li> <li><strong>Activity Observed:</strong> Placement of storm drains.</li> <li><strong>Compliance:</strong> The storm drains were observed during placement.</li> </ul> If you have any questions or require further clarification regarding the content of this report, please do not hesitate to get in touch. We are readily available to address any inquiries you may have. We appreciate the opportunity to contribute to this project.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel