Density test report
Date
*
Project Number
*
2022C218 (draft)(Ramp 20 Pavement Replacement - IFB-1230102)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor's work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>performed straight edge for Ramp 20 Phase 4, from lanes 1 to 17 and phase 5 from lanes 1 to 7 and coring for phase 4 and 5.</li> <li>sampling of concrete of beams for ramp 20 phase 4 and phase 5. spalls.</li> <li><span style="font-family: arial, helvetica, sans-serif">placement of backfill GAB for the end around between STA 7019 to STA 7021+50 in the time arrival already compacted</span><span style="font-family: arial, helvetica, sans-serif">. Density</span> testing was performed using a Troxler nuclear gauge (#3430, serial #85759). Test results indicated that the compacted material met project requirement of 95% of the maximum dry density.</li> </ul>
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel