Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
On November 15, 2023, the undersigned ASEC representative visited the Lakeside Development site. The purpose of the visit was to inspect the undercutting of topsoil materials in Lots #68, 69, 70, and 71, and to evaluate surficial soils adjacent to Lots #34 through 37, which were in question by the contractor. <hr /> <h2>Inspection and Findings</h2> <h3>Undercutting of Topsoil in Lots #68, 69, 70, and 71</h3> <ul> <li>The topsoil material depths in these lots were visually inspected quantity.</li> <li>The undercutting areas are shown in red on the attached drawing.</li> </ul> <h3>Evaluation of Soils Behind Lots #34 - 37</h3> <ul> <li>The soils in this area were observed to be tan to brown, Silty fine to medium, and Sand.</li> </ul> <h3>Excavation of Large Boulders</h3> <ul> <li>Large boulders were excavated from the road in the area highlighted in yellow on the attached drawing.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel