Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
On November 6, 2023, the undersigned ASEC representative visited the Lakeside Development site to visually inspect subgrade soils for the parking area, particularly where the burn pit was previously discovered. This inspection was conducted to assess the condition of subgrade soils following the removal of all deleterious soils from the burn pit area. <hr /> <h2>Subgrade Inspection for Parking Area</h2> <h3>Excavation Dimensions</h3> <ul> <li>The dimensions of the excavated area are as follows: <ul> <li>Length of sides: 171 feet</li> <li>Bottom width: 100 feet</li> <li>Middle width: 94 feet</li> <li>Top width: 96 feet</li> <li>Depth: Approximately 10 feet</li> </ul> </li> </ul> <h3>Volume Calculation</h3> <ul> <li>The approximate volume of the excavated area is calculated as 129,850 cubic feet.</li> </ul> <h3>Engineering Observations and Recommendations</h3> <ul> <li>The subgrade area was probed using a 3/8" diameter probe rod to assess its stability and suitability for fill placement.</li> <li>Based on these observations, the area is deemed ready for fill to be placed.</li> </ul>
Upload Images
Image
Description
1
2
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel