Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C195 (draft)(Kimbal Bridge Tract)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our ASEC representative visited the site upon request by the contractor to observe the proof-rolling operations for the proposed roadway adjacent to Lots #15 - 21, near the beginning of the wetland boundary. A CAT 740B articulated dump truck loaded with soil was employed to conduct the proof-roll. During the proof-roll, conducted across the designated area, it was observed that: <ul> <li>The soil subgrade under the loaded dump truck showed no signs of severe deflection or rutting.</li> <li>The subgrade soils appear suitable for continued backfilling.</li> </ul> The subgrade displayed the necessary structural integrity and stability, indicating that the current conditions are conducive for the contractor to continue with backfilling operations.
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel