Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
On October 6, 2023, Vidal Dias of AS ENGINEERING AND CONSULTING, LLC (ASEC) visited the site at the contractor's request to observe proofrolling of the remaining portions of Travers Lane, as illustrated in the attached drawing. During the proof-rolling, conducted using a loaded dump truck, the entirety of the remaining sections of Travers Lane was thoroughly assessed. No significant rutting or deflection was observed throughout the examined span. The specific areas that underwent proof-rolling are highlighted and annotated in the drawing provided below. The assessed sections of Travers Lane appear to be suitable for pavement placement, aligning with project plans and specifications. AS Engineering and Consulting, LLC remains committed to ensuring the highest quality for this project. Should there be any questions or further clarifications needed regarding this report or any related documents, please don't hesitate to get in touch with us.
Upload Images
Image
Description
1
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel