Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C218 (draft)(Ramp 20 Pavement Replacement - IFB-1230102)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor's work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>A pre-pour observation performed in the Ramp 20, phase 1, Lane 1, on this day. The contractor completed rebar and dowel basket placement for this lane.</li> <li>The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were required.</li> <li>Contractor cleaned loose rock and debris and puddles of water from the base.</li> <li>Baskets were found to be level and straight and secured.</li> <li>Dowel bars have epoxy. Embedment depth was found to be 15" in concrete.</li> <li>The reinforcing steel was checked for correct size, number of bars, location of bars, spacing, cleanliness, support against displacement, splicing, clearance and steel grade. Based on visual observations and field measurements, the reinforcing steel at the utility panel, appeared to be acceptable for size, spacing and quantity.</li> <li>Our representative along with Ashud of ATLQA and Braylyn the ATLNext representative and CWM rep Brandon signed the pre-pour card.</li> <li>ATL Paving placed approximately 6 inches of Cement Treated Base (CTB) for lanes 9 to 12. SE corner (125'x400') area.</li> <li>Performed straightedge on CTB for lanes 6-8 between STA 107+20 and 114+40 and for lanes 9 to 11 between STA 107+20 to 109+70.</li> <li>performed CTB Coring from lane 6 to 12,</li> <li>1, panel 8=6 1/4"</li> <li>2, panel 8= 6"</li> <li>3, panel 9=6"</li> <li>4, panel 5= 6"</li> <li>5, panel 4=6"</li> <li>6. panel11=6"</li> </ul> In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel