Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
The undersigned ASEC representative was on-site on September 20, 2023, to observe excavation of five test pits just north of the pond to evaluate a berm for potential in-situ soils that could be re-used as structural fill material. The objective was to assess the soil conditions and provide engineering recommendations for the cut depths required to reach grade. <hr /> <h2>Test Pit Excavation and Evaluation</h2> <h3>Test Pit Locations and Cut Depths</h3> <ul> <li>Test Pit 1: 4-foot cut to grade</li> <li>Test Pit 2: 4-foot cut to grade</li> <li>Test Pit 3: 5-foot cut</li> <li>Test Pit 4: 6-foot cut</li> <li>Test Pit 5: 8-foot cut</li> </ul>
Upload Images
Image
Description
1
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel