Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C227(Riverwalk Manor (CMT) Unit 2, PH 4E and 4F)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<div class="empty:hidden"> The above mentioned AS Engineering and Consulting (ASEC) representative, visited Riverwalk Manor site to perform quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were made on-site: </div> <div> The following observations were recorded during the shift:</div> <ul> <li> Our representative observed the drilling of rock and verified the accuracy of the top of rock and termination depths at west of Lot#406.</li> <li class="empty:hidden">The resulting volumes were calculated and are presented in a separate report, which is dated in conjunction with the blast day for reference.</li> </ul> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel