Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C159(Airfield Repairs 2021-23)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor's work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>A pre-pour observation was performed in the Airfield repair, Ramp 6 N, Storm drains portions of the project this day. The contractor completed rebar and dowel placement for these repair locations.</li> <li>The writer visually inspected the installation and setup of these Storm drains and advised the contractor representatives of any minor corrections that were required.</li> <li>Contractor cleaned loose rock and debris from the base.</li> <li>Our representative along with Selim of 2MNEXT and the ATLNex representative and CWM Rep Tim signed the pre-pour card.</li> <li>and also sampled and observed the placement of concrete for Storm drains repairs.</li> </ul>
Upload Images
Image
Description
1
2
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel