Density test report
Date
*
Project Number
*
2023C144(Carodel Farms @ Union Church Rd)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, our ASEC representative was on site to observe the construction of the welded wire basket retaining wall. The following was observed:</span> <ol> <li><span style="font-family: arial, helvetica, sans-serif">Introduction:</span></li> </ol> <span style="font-family: arial, helvetica, sans-serif">This report provides an overview of the construction process and key details regarding the welded wire basket retaining wall at [Carodel Farm@Union Charch Rd]. The construction of the retaining wall was observed the project design drawings and specifications. The purpose of this report is to document the construction methods, materials used, and quality control measures employed during the construction of the welded wire basket retaining wall.</span> <ol start="2"> <li><span style="font-family: arial, helvetica, sans-serif">Construction Details:</span></li> </ol> <span style="font-family: arial, helvetica, sans-serif">The retaining wall utilized welded wire baskets, each measuring approximately 18” x 18”. These baskets were observed to be installed in accordance with the project design drawings for size, spacing and quantity. The reinforced zone behind the wire baskets extended to a distance of approximately 18 feet, as specified in the project design. The backfill soil was placed in layers of 8 to 10 inches and compacted using a sheepsfoot roller.</span> <ol start="3"> <li><span style="font-family: arial, helvetica, sans-serif">Construction Process:</span></li> </ol> <span style="font-family: arial, helvetica, sans-serif">The construction process involved the following steps:</span> <ol> <li><span style="font-family: arial, helvetica, sans-serif">Welded Wire Basket Installation:</span></li> <li><span style="font-family: arial, helvetica, sans-serif">Reinforcement and Backfill Placement:</span></li> </ol> <span style="font-family: arial, helvetica, sans-serif">The reinforced zone behind the wire baskets extended to approximately 18 feet. Backfill soil was placed in layers of 8 to 10 inches. The sheepsfoot roller was used to compact the backfill soil.</span> <ol start="4"> <li><span style="font-family: arial, helvetica, sans-serif">Quality Control Measures:</span></li> </ol> <ol> <li><span style="font-family: arial, helvetica, sans-serif">Testing:</span></li> </ol> <span style="font-family: arial, helvetica, sans-serif">The backfill soil compaction was tested using a nuclear gauge. Results are attached. General probing using a 3/8" diameter probe rod was also performed.</span>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel