Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C111(DOA Fiber Infrastructure Improvements )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
As per your request, our representative from AS Engineering and Consulting (ASEC) conducted a site visit to fulfill quality control inspection and testing responsibilities. Visual observation techniques were employed to ensure alignment with project drawings, specifications, relevant codes, and material submissions. The following on-site observations were made: The placement and compaction of the Graded Aggregate Base (GAB) for the south of Vault 2. Upon arrival, it was noted that the Contractor had already compacted the GAB to the finished grade located south of the footing of Vault 2. This compaction was achieved using a Drum Compactor. The results of density tests performed on this day indicated that the compacted materials met the project requirement of achieving 100% density at the finished grade, which aligned with the maximum dry density obtained through the Modified Proctor test method as per ASTM D 1557-12.
Upload Images
Image
Description
1
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel