Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
On July 27, 2023, the assigned ASEC representative was present on the Northfields Project site to observe and evaluate the ongoing work for adherence to the project plans, specifications, and standards. The area of focus was just north of the new entrance being constructed, directly opposite the existing neighborhood entrance. The specified area measured approximately 23 feet wide and 225 feet long. An additional 12-inch depth of soil was removed in the sections where the waterline was repositioned. During the visual inspection, two areas of deflection were detected directly adjacent to the road: one measuring 8 feet x 4 feet and another 25 feet x 6 feet. These areas are of concern as they could indicate possible soil stability issues. In the process of working on these areas, an unmarked Xfinity internet line was accidentally severed. Xfinity representatives were onsite and repaired the line. <hr /> <strong>OBSERVATIONS AND RECOMMENDATIONS:</strong> <ol> <li>The contractor should exercise caution in the areas where utilities have been moved, including the sections where the waterline has been repositioned. Any additional excavation should be undertaken carefully.</li> <li>The areas of deflection identified should be addressed immediately to prevent any potential structural or stability issues.</li> <li>This incident emphasizes the importance of comprehensive utility locating before the start of excavation works. Contractors should verify the presence of any potential unmarked lines to avoid similar incidents in the future.</li> <li>Regular site inspections should continue to ensure all construction activities adhere to the project specifications and safety standards.</li> </ol>
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel