Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
On July 26, 2023, the assigned ASEC representative was present on-site at the Northfields Project to observe and evaluate the ongoing work for compliance with the project plans, specifications, and standards. A proof-roll was performed on a 355-foot long section that extended from the newly constructed entrance over the creek and terminating adjacent to the retention pond south of the creek. The proof-roll was conducted using a loaded dump truck making parallel passes. During the proof-roll, a notable deflection was observed in a 25 x 5-foot area adjacent to the fire hydrant. This indicates an area of potential instability or insufficient compaction, requiring remedial work. The contractor has been advised to excavate this area, removing approximately 12 inches of the existing material. The excavated area will then be backfilled with a graded aggregate base (GAB). The entire section was subsequently backfilled according to the construction plans. OBSERVATIONS AND RECOMMENDATIONS: 1. The proof-roll was an essential exercise to identify weak spots in the subgrade, and the deflection noted near the fire hydrant is a significant finding. Contractors should expedite the excavation and backfilling process to prevent any delays. 2. The backfilled area should be closely monitored for stability, especially in the 25 x 5-foot section that has been corrected. 3. Regular proof-rolls should be performed on all areas receiving fill to ensure compliance with the project specifications. 4. The contractor should continue to comply with the construction plans during the backfilling process.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel