Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C111(DOA Fiber Infrastructure Improvements )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
Our AS Engineering and Consulting (ASEC) representative was on site for the purpose of providing visual quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site <span class="zminlnk">today:</span> A request was made for compaction testing for the final lift of the vault 3 area for the Graded Aggregate Base. The lift was then topped off with calcium chloride. Tests were completed using a Troxler 3430 (serial number 38069) Test #1 South side 134.5 pcf (Dry Density), 1.8% (Moisture Content) Test #2 North side 132.1 pcf (Dry Density), 2.9% (Moisture Content) Cheoah was concerned since calcium chloride had been added no additional water or compaction could be completed. This area requires no structural pavement. No further testing or remediation was performed.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel