Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C178(Ramp 2 Pavement Replacement)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor's work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>A pre-pour observation was performed in the Ramp 2, phase 11, Lane 1 and Lane 3 and lane 5, portions of the project this day. The contractor completed rebar and dowel basket placement for these lanes.</li> <li>The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were required.</li> <li>Contractor cleaned loose rock and debris and puddles of water from the base.</li> <li>Baskets were found to be level and straight and secured.</li> <li>Dowel bars have epoxy. Embedment depth into the concrete was found to be 15 inches.</li> <li>Our representative along with Ashud of ATLQA and the ATLNext representative Hazim signed the pre-pour card.</li> </ul>
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel