Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
On July 25, 2023, the undersigned ASEC representative was present on the project site as per the request by the client and/or contractor. Using visual observation techniques, the representative evaluated the work-in-place for its adherence to the project plans, specifications, codes, standards, and material submittals. The day's work was primarily focused on the east shoulder of Pitman Road, as illustrated in the attached drawing. The contractor's team removed approximately 17 inches of soil across a 130-foot section on Pitman Road. During the excavation process, Forsyth County engineers were present on-site and raised concerns about the proximity of utilities adjacent to the work area. However, following a comprehensive review, it was decided that the work could continue but utilities companies would be notified to revisit the site at a later date to relocate the utilities, ensuring safety and preventing any possible disruptions. Subsequently, the contractor laid a 12-foot-wide woven fabric over the exposed subgrade. This was followed by the placement of graded aggregate base (GAB) on top of the fabric in accordance with the Department of Transportation (DOT) specifications.
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel