Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our ASEC representative arrived on site to perform a site inspection at the designated work area, located at the entrance of the Northfields neighborhood. The exact location is highlighted in Attachment A. In accordance with the verbal instructions of Forsyth County inspectors and DOT guidelines, Wilbanks contractors executed excavation operations to a depth of 17 inches. At this depth, the presence of wet soils was noted in Areas A & B (see Attachment B). In response to these conditions, ASEC issued a recommendation for an additional 5-inch excavation in Areas A & B to remove the saturated soils. Wilbanks contractors proceeded with the advised measure, backfilling the area with #34 stone. Subsequent to backfilling, compaction was conducted using a vibratory roller. Eight passes were performed over the area. A 10-inch layer of GAB was installed atop the stone to fortify the area further.
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel