Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C144 (draft)(Carodel Farms @ Union Church Rd)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Vidal Shengan (Vidal Shengan)
Observations/Finding
Summary
*
<div class="flex-1 overflow-hidden"> <div class="react-scroll-to-bottom--css-fwbsy-79elbk h-full dark:bg-gray-800"> <div class="react-scroll-to-bottom--css-fwbsy-1n7m0yu"> <div class="flex flex-col text-sm dark:bg-gray-800"> <div class="group w-full text-gray-800 dark:text-gray-100 border-b border-black/10 dark:border-gray-900/50 bg-gray-50 dark:bg-[#444654]"> <div class="flex p-4 gap-4 text-base md:gap-6 md:max-w-2xl lg:max-w-[38rem] xl:max-w-3xl md:py-6 lg:px-0 m-auto"> <div class="relative flex w-[calc(100%-50px)] flex-col gap-1 md:gap-3 lg:w-[calc(100%-115px)]"> <div class="flex flex-grow flex-col gap-3"> <div class="min-h-[20px] flex items-start overflow-x-auto whitespace-pre-wrap break-words flex-col gap-4"> <div class="markdown prose w-full break-words dark:prose-invert light"> On 7/17/2023, our AS Engineering and Consulting (ASEC) representative, visited the Carodel Farms site to perform quality control inspection and testing services. Visual observation techniques were employed to ensure compliance with project drawings/specifications, applicable codes, and material submittals. The following observations were made on-site: <ol> <li>Installation of Precast Concrete Units: The contractor installed precast concrete units numbered 30 and 31 (from sheet C12.1). Visually inspected the installation of the precast units and confirmed that they met the project requirements.</li> <li>Installation of HDPE Pipes: Between precast concrete units numbered 30 and 31 on sheet C12.1 the contractor also installed HDPE (High-Density Polyethylene) piping. Visually inspected the pipe installation and verified that it was in accordance with the project specifications.</li> <li>Rock Drilling: A total of 105 holes were drilled in the rock over an area of 5,145 square feet (105 x 49). The spacing between the drilled holes was 7 feet, and the hole diameter was 4 inches. Drilling results were collected between started depths and termination depths of rocks. The drilling activities were carried out as per the project specifications.</li> </ol> 4. Observed backfilling of soil: backfill soil mix with big rocks were placed between Lot #106 and Lot #116 to depths of 8 foot below finished grade, as previously identified on sheet C 0.1. The quality control representative visually inspected the placement and compaction activities and determined them to be in compliance with project requirements. No issues were noted during the observation. </div> </div> </div> <div class="flex justify-between lg:block"> <div class="text-gray-400 flex self-end lg:self-center justify-center mt-2 gap-2 md:gap-3 lg:gap-1 lg:absolute lg:top-0 lg:translate-x-full lg:right-0 lg:mt-0 lg:pl-2 visible"> <div class="flex gap-1"></div> </div> </div> </div> </div> </div> <div class="h-32 md:h-48 flex-shrink-0"></div> </div> </div> </div> </div>
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel