Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C144 (draft)(Carodel Farms @ Union Church Rd)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Vidal Shengan (Vidal Shengan)
Observations/Finding
Summary
*
Our AS Engineering and Consulting (ASEC) representative visited the Carodel Farms site to conduct quality control inspection and testing services. Visual observation techniques were employed to ensure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were made on-site: <ol> <li>Topsoil Placement: The contractor has placed compacted topsoil within the undisturbed buffer zone, as referenced on sheet C 0.1. The quality control representative visually inspected the placement and determined it to be in compliance with project requirements. No issues were noted during the observation.</li> <li>HDPE Pipe Installation: The contractor has installed HDPE (High-Density Polyethylene) pipe in accordance with the specifications outlined on sheet number C13.10. Section C3 of the pipe has been successfully placed. The quality control representative visually inspected the installation and confirmed that it was executed in accordance with the project requirements. No deviations or concerns were observed during the inspection.</li> </ol>
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel