Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C058(Parkside at Mason Mill)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Vidal Shengan (Vidal Shengan)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. On this day, our ASEC representative observed the placing of reinforcing steel for Lots #106 thru 112. Our representative found that, in general, reinforcing steel placement was in accordance with the project plans (TYP.WALL SECTION @A5 -01 and A5-02) for size, spacing and quantity.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel