Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C144 (draft)(Carodel Farms @ Union Church Rd)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Vidal Shengan (Vidal Shengan)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Our ASEC representative visually observed site activities to check versus drawing/specifications, applications code, and materials submittals. The following observations were observed on site this day. The placement and compaction of backfill soils for Wall A. The contractor used a CP56B CAT to compact the backfill materials. Our representative also observed the contractor drilling 15 locations of potential rock for Detention Pond 1. The mass of rock varied according to depth: 1- Slope / C-26 the driller start drilling rocks at 18 foot to 27 foot termination depth of rocks 2-Toe slope / C-45 rocks at 22 foot to 27 foot 3- Slope / C-42 rocks at 26 foot to 28 foot 4- Floor / C-36 rocks at 26 foot to 28 foot 5- Toe slope / C-34 rocks at 8 foot to 13 foot and 24 foot to 27 foot the driller was perform the test on a surface 8 by 8 for some The drilling equipment used was identified as a MPS SANDVIK 101- 82. Results of rock quantities will be issued in a separate report.
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel