Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C227(Riverwalk Manor (CMT) Unit 2, PH 4E and 4F)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, </span><span style="font-family: arial, helvetica, sans-serif">applicable codes, and materials submittals. The following observations were observed on site this day.</span> <span style="font-family: arial, helvetica, sans-serif">The placement and compaction of backfill soils for the roadway and Lots #415, 416 and 417 continued this day.</span> <span style="font-family: arial, helvetica, sans-serif">At the time of arrival, our representative observed that work was in progress with lifts being placed to about 20 feet below finished grade and compacted using a 810 compactor.</span> <span style="font-family: arial, helvetica, sans-serif">The density test results are on hold until a Moisture-Density Relationship can be performed. In-place moisture contents were found to be high.</span>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel