Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C178 (draft)(Ramp 2 Pavement Replacement)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe and monitor the contractor's work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>Work was being performed in the Ramp 2 - Phase 4 and sewer enhancements of the project on this day.</li> <li>Performed concrete coring and filling and logger reading for Ramp 2 - Phase 4.</li> <li>Our representative, along with Depto of ATLQA and ATLNext representative Hazim and CWM rep Brandon observed the process.</li> <li>In addition, our ASEC representative observed straight edge testing of Ramp 2 - Phase 4.</li> <li>Also observed the installation of pipe between MH#3 and MH#9 and contractor installation of MH#3. GAB compaction was not ready for testing today.</li> </ul>
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel