Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C111(DOA Fiber Infrastructure Improvements )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Isaac Davis (Isaac Davis)
Observations/Finding
Summary
*
As requested, our AS Engineering & Consulting LLC representative was on site to perform a visual reinforcing steel inspection (for Vault #2). Compaction around the manways (tech campus) was also performed. Vault #2 <ul> <li>Rebar spacing met job specifications.</li> <li>Rebar gap between both top and bottom layers met job specifications.</li> <li>Rebar was tied off and mounted as per job specifications.</li> <li>Contractor put additional rebar to reinforce the areas that were deficient due to bollards.</li> </ul> Tech campus <ul> <li>The contractor filled in back section of manhole with M10 sand.</li> <li>This area was probed with a 3/8-inch diameter probe rod and one density test performed. Did not meet compaction requirements so no additional work was performed in this area at this time.</li> <li>Following concrete placement around the conduit, compaction around manhole will be performed (and retested).</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel