Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C178(Ramp 2 Pavement Replacement)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe and monitor the contractor's work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li style="list-style-type: none"> <ul> <li>Work was being performed in the Phase 1 portion of the Ramp 2 pavement replacement project on this day.</li> <li>At this time the panels were removed and the subgrade appears to have been milled and adjusted to proposed bottom of concrete elevation.</li> <li>The writer along with Sudipto of ATLQA and ATLNext representative performed a proofroll on the subgrade.</li> <li>A fully loaded tandem axle truck was used to proof-roll the above the mentioned subgrade with multiple passes across the area. The subgrade appeared to be unyielding and little to no deflection was observed during the proof-roll in this area.</li> <li>In addition to this, the writer along with Sudipto of ATLQA and ATLNext representative Craig Garland performed a post demolition spall check.</li> </ul> </li> </ul> In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Upload Images
Image
Description
1
Proofroll within Phase 1 of the project
2
Proofroll within Phase 1 of the project
3
Proofroll within Phase 1 of the project
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel