Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, the site was visited by the AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, </span><span style="font-family: arial, helvetica, sans-serif">applicable codes, and materials submittals. the following observations were observed on site this day.</span> <span style="font-family: arial, helvetica, sans-serif">The placement and compaction of backfill soils for the Water Storm pipe trench between manholes, MH AA41 and MH AA42.</span> <span style="font-family: arial, helvetica, sans-serif">At the time of arrival work was on progress, the soils at depths about 3 feet below finished grade were compacted using a CP-433C compactor, </span><span style="font-family: arial, helvetica, sans-serif">tests result indicated that the compacted material met project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698).</span> <span style="font-family: arial, helvetica, sans-serif">Note: moister content exceeded from specified limit.</span> <span style="font-family: arial, helvetica, sans-serif">Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759)</span> <span style="font-family: arial, helvetica, sans-serif">P-3, Proctor-99.4 @21.3%</span> <ul> <li><span style="font-family: arial, helvetica, sans-serif">T1- 2 feet below from finish grade, Yd 90.3 M% 29.3, Compaction 90.1 %</span></li> <li><span style="font-family: arial, helvetica, sans-serif">T2- 3 feet below from finish grade, Yd 91.6 M%27.2, Compaction 92.1%</span></li> <li><span style="font-family: arial, helvetica, sans-serif">T3- 1 foot below from finish grade, Yd 89.8 M% 29 Compaction 90.4%</span></li> <li><span style="font-family: arial, helvetica, sans-serif">T4- 2.5 feet below from finish grade, Yd 93.3 M% 27.3, Compaction 93.8%</span></li> <li><span style="font-family: arial, helvetica, sans-serif">T5- 0.5 foot below from finish grade, Yd 89.6 M% 26.9, Compaction 90.1%</span></li> <li><span style="font-family: arial, helvetica, sans-serif">T6- 1.5 feet below from finish grade, Yd 90.1 M% 27.5, Compaction 90.6 %</span></li> <li><span style="font-family: arial, helvetica, sans-serif">T7- finish grade, Yd 92.2 M% 27.2, Compaction 92.7%</span></li> <li><span style="font-family: arial, helvetica, sans-serif">T8- finish grade, Yd 91.06 M% 27.6, Compaction 91.6%</span></li> </ul> If you have any questions about our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel