Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C111(DOA Fiber Infrastructure Improvements )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
As requested, the site was visited by the AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. The placement and compaction of backfill soils for the fiber vault#2 and Duct line East of Vault#2. At the time of arrival, the contractor already placed soils and compacted upto finished grade elevation. Density testing was performed on the final lift using a Troxler nuclear gauge (#3430, serial #85759) Note: A sample of fill material was transported to the lab for moisture density relationship curve (Proctor Curve) determination. T1- finish grade, Yd 91.7 M% 29.7 Compaction % T2- finish grade, Yd 90.9 M% 28.3, Compaction % T3-finish grade, Yd 103.2 M% 21.3 Compaction %
Upload Images
Image
Description
1
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel