Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C106(Taxiway 2022 Pavement Replacement )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
On this day, Amin Azimi, representing AS Engineering & Consulting, LLC, arrived at the above mentioned project location, as scheduled to observe the proof-roll of subgrade soils. The purpose of this observation was to assess the readiness of the site for testing and to ensure the accuracy and effectiveness of the proof-rolling process. Upon arrival, it became evident that the onset of inclement weather had affected the site conditions significantly. Attached pictures show the site conditions on this day. Due to the adverse weather conditions and their impact on the site's readiness, the decision was made to cancel the proof-rolling for the day. It was determined that proceeding with the testing under such conditions could compromise the accuracy and reliability of the results and potentially pose safety risks to personnel and equipment.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel