Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C227(Riverwalk Manor (CMT) Unit 2, PH 4E and 4F)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, our AS Engineering and Consulting (ASEC) representative visited the site for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, </span><span style="font-family: arial, helvetica, sans-serif">applicable codes, and materials submittals. The following observations were observed on site this day.</span> <span style="font-family: arial, helvetica, sans-serif">Compaction of fill placed for Lot #58 continued.</span> <span style="font-family: arial, helvetica, sans-serif">At the time of arrival, the contractor had already placed soils and compacted to finished grade. Moisture contents were checked and found to exceed maximum specified limits. </span> <span style="font-family: arial, helvetica, sans-serif">Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759). </span> <span style="font-family: arial, helvetica, sans-serif">Density test results indicate that the compacted material met the project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698). </span> <span style="font-family: arial, helvetica, sans-serif">Density testing results:</span> <span style="font-family: arial, helvetica, sans-serif">P-1 Moisture-Density Relationship (proctor) = 100.4 pcf @18.6%</span> <span style="font-family: arial, helvetica, sans-serif">T1-elevation at finish grade@ lot 58, Yd 103.4 M%17.5, Compaction: 102.98 %</span> <span style="font-family: arial, helvetica, sans-serif">T2-elevation at finish grade@ lot 58, Yd 96.1M%19.5, Compaction: 95.7%</span>
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel