Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C227(Riverwalk Manor (CMT) Unit 2, PH 4E and 4F)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, the site was visited by the AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, </span><span style="font-family: arial, helvetica, sans-serif">applicable codes, and materials submittals. the following observations were observed on site this day.</span> <span style="font-family: arial, helvetica, sans-serif">Contractor continued backfill and compaction for Lots 402, 403,404.</span> <span style="font-family: arial, helvetica, sans-serif">upon arrival work was already in progress contractor was performing lifts, each lift being 12 inches,</span> <span style="font-family: arial, helvetica, sans-serif">The soils observed on this date did not appear to be placed in accordance with project drawings and specifications, Lift thickness was higher than recommended. </span><span style="font-family: arial, helvetica, sans-serif">The contractor was advised to reduce the thickness of the lift, Soil was brought by 2 dump trucks; spread was done by Komatsu 51 pxi and was compacted using a caterpillar 815 F.</span> <span style="font-family: arial, helvetica, sans-serif">Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759). </span> <span style="font-family: arial, helvetica, sans-serif">tests result indicated that the compacted material met project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698). </span> <span style="font-family: arial, helvetica, sans-serif">Density testing result:</span> <span style="font-family: arial, helvetica, sans-serif">P-01 proctor- 100.4@18.6%</span> <span style="font-family: arial, helvetica, sans-serif">T1-elevation at finish grade@ lot 402, Yd 99.3 M%16.6, Compaction: 98.9 %</span> <span style="font-family: arial, helvetica, sans-serif">T2-elevation at finish grade@ lot 403, Yd 97.9 M%16.6, Compaction: 97.5 %</span> <span style="font-family: arial, helvetica, sans-serif">T3-elevation -1 foot from finish grade@ lot 404 Yd 92.1, M%17.1, Compaction: 91.7 %</span> <span style="font-family: arial, helvetica, sans-serif">T4-elevation at finish grade@ Lot 404, Yd 99.6, M%16.8, Compaction: 99.2 %</span>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel