Density test report
Date
*
Project Number
*
2022C227(Riverwalk Manor (CMT) Unit 2, PH 4E and 4F)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
As requested the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Contractor continued backfill and compaction for Lots #422, 423, 424,426,427,428 and the roadway. Upon arrival, work was already in progress with the contractor placing excessively thick lifts (16 inches). The soils observed on this date did not appear to be placed in accordance with job specifications due to excessive lift thicknesses. Contractor was notified. Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759). Density test results indicate that the compacted material met the project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698). Density testing result: P-01 Moisture-Density Relationship (proctor) = 100.4 pcf@ 18.6% T1-elevation at finish grade@ lot 427, Yd 90.5, M%17, Compaction: 90.1% T2-elevation -1.5 feet from finish grade@ lot 426, Yd 90.5 M%18.3, Compaction: 90.1 % T3-elevation -5 feet from finish grade@ road, Yd 95.1, M%17.5, Compaction:94.7 % T4-elevation -at finish grade@ lot 424, Yd 93.0, M%16, Compaction: 92.6 % T5-elevation -1.5 feet from finish grade@ lot 423, Yd 95.5, M%17.3, Compaction: 95.1 % T6-elevation - at finish grade@ lot 428, Yd 97.2, M%15.7, Compaction: 96.8 % T7-elevation-2.5 feet from finish grade@ lot 422, Yd 94.2, M%16.7 , Compaction: 93.8 % T8-elevation -1 foot from finish grade@ road, Yd 99.2, M%19.8, Compaction: 98.8 % T9-elevation-0.5 feet from finish grade@ lot 423, Yd 97.2, M%16.2, Compaction: 96.8%
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel