Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C227(Riverwalk Manor (CMT) Unit 2, PH 4E and 4F)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, our AS Engineering and Consulting (ASEC) representative visited the site for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, </span><span style="font-family: arial, helvetica, sans-serif">applicable codes, and materials submittals. The following observations were observed on site this day.</span> <span style="font-family: arial, helvetica, sans-serif">Contractor continued backfill and compaction for Lots #421, #422, #423, #424 and the roadway.</span> <span style="font-family: arial, helvetica, sans-serif">Contractor contined filling building lots with excessively thick lifts. Our representative continued recommendations for keeping these soil lifts to 12 inches in thickness or less. </span> <span style="font-family: arial, helvetica, sans-serif">Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759). </span> <span style="font-family: arial, helvetica, sans-serif">Density test results indicate that the compacted material met project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698). </span> <span style="font-family: arial, helvetica, sans-serif">Density testing result:</span> <span style="font-family: arial, helvetica, sans-serif">P-01 Moisture-Density Relationship (proctor) = 100.4pcf @ 18.6%</span> <span style="font-family: arial, helvetica, sans-serif">T1-elevation -11 feet from finish grade@ lot 422. Yd 93.07, M%15.6, Compaction: 93.3%</span> <span style="font-family: arial, helvetica, sans-serif">T2-elevation -13 feet from finish grade@ road, Yd 95.48, M%17.5, Compaction:95.09 %</span> <span style="font-family: arial, helvetica, sans-serif">T3-elevation -12 feet from finish grade @ lot 424, Yd 97.37, M%18.1, Compaction: 97.0 %</span> <span style="font-family: arial, helvetica, sans-serif">T4-elevation -12.5 feet from finish grade @ lot 423, Yd 94.3, M%16.6, Compaction: 93.9 %</span> <span style="font-family: arial, helvetica, sans-serif">T5-elevation - 2 feet from finish grade @ lot 421, Yd 91.7, M%17.1, Compaction: 91.3 %</span>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel