Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Vidal Shengan (Vidal Shengan)
Observations/Finding
Summary
*
Our AS ENGINEERING AND CONSULTING representative visited the site at the client's request to observe utility pipe and manhole placement. During the day the contractor attempted to join manhole A2 to A3 with a pipe for a depth ranging from 14 - 16 feet and before placing the manhole and pipe, the contractor placed extra stone 6 to 8" in depth at the bottom and covered the pipe with stone prior to backfilling. A CP-C323C compactor was used to compact these soils during our evaluation. AS Engineering and consulting, LLC. Appreciates the opportunity to be on your service on this project. if they have any questions, please contact us.
Upload Images
Image
Description
1
manhole d5 connect with pipes above stone 6"
2
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel