Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C227(Riverwalk Manor (CMT) Unit 2, PH 4E and 4F)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our AS ENGINEERING AND CONSULTING (ASEC) visited the site at the contractor's request to observe soil placement for Riverwalk. The attached photo shows the designated cut-and-fill area. Fill soils were observed to be light tan, sandy silts. Soil moisture contents were high due to recent heavy rains. Our representative noted that soils were being placed in 36-inch lifts. The contractor was notified to reduce the lift size to 6 - 12 inches. Compaction results for the top 6 inches of soil placements are shown below. Compaction test results are shown below: Wet Density 107.8 pcf Dry Density 89.8 pcf Moisture: 20% Compaction: 90.7% Wet Density: 109.0 pcf Dry Density: 90.8 pcf Moisture: 19.5% Compaction: 90.4%
Upload Images
Image
Description
1
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel