Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Vidal Shengan (Vidal Shengan)
Observations/Finding
Summary
*
As requested, our AS Engineering & Consulting (ASEC) representative was on site to observe site activities: Upon arrival, the contractor began the laying of pipe. The contractor proceeded to work on manhole A0 to manhole D1 according to project specifications. The contractor excavated to a depth of 20 feet (with proper sloping). Ground water was encountered between a depth of 13' to 20' below grade. Mr. Ram Mogulla of ASEC recommended the placement of additional #57 stone to stabilize the subgrade prior to pipe and backfill placement. The contractor has been laying pipe for most of the day.
Upload Images
Image
Description
1
pipes above 12" to 18" of gravel
2
slope 0.85%
3
pipes covered with gravel
4
5
work location
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel