Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Vidal Shengan (Vidal Shengan)
Observations/Finding
Summary
*
Our AS ENGINEERING AND CONSULTING (ASEC) representative visited the site at the client's request to observe the contractor's field activities. Visual observation techniques were employed to evaluate work in place for general compliance with the project plans and specifications. The following was observed: 9am to 11 :40am = The contractor was cutting back manhole subgrade soils several feet in an area of 20' x 10'. 11:40am to 12 :18pm = Raining on site. 12:18pm to 1pm = Formed manhole structure and begin placing gravel at the base. Thickness of the gravel layer was observed to be 12 to 16 inches. 1:30pm to 4pm = Placed fabric over the gravel layer at the manhole prior to the placing of backfill. Ultimately, the onset of heavier rain ended activities for the day soon after.
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel