Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
AS Engineering and Consulting, LLC (ASEC) visited the site at the client's request to perform footing inspections for Lots #6,8,9,10,12 and 13. During the evaluation, well-compacted fill soils were encountered underlain by residual soils within the planned building pad area. Lots #8 and 9 refused at two feet using DCP equipment. One DCP was taken in the remediated area of Lot #10 (outlined in red on the attached image). The area was probed, and one DCP test was performed; well-compacted soils were encountered at the base of each pier.
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel