Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
The undersigned ASEC representative was on site as requested by the Client to observe the contractor's field placement and compaction of soils. Visual observation techniques were employed to ensure the soils were clean and contained no construction debris or organics. The provenance of the soils being placed is from the cut where the third moisture-density relationship (proctor) samples was taken. Soils in the top 15 feet of this area are primarily comprised of red to tan silty fine to medium sands within the upper 3-4 feet. Soils become coarser and rockier with depth consisting of 3–6-foot diameter boulders scattered within the layer.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel