Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C002(Runway 9L End Around Taxiway)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif;">As requested, the site was visited by the AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project specifications, applicable codes, and materials submittals.</span> <span style="font-family: arial, helvetica, sans-serif;">The following observations were made on site this day.</span> <span style="font-family: arial, helvetica, sans-serif;">Contractor continued work on E line from E-2 to E-5. and proposed grass area located Northwest of E-2 to E-3 line and grass area located to the west of A9, Fill placed and spread using a dozer and ground crew collecting oversized material. Compunction performed using a D815., Sheep feet roller and a loaded 740 B off road, dump truck. </span> <span style="font-family: arial, helvetica, sans-serif;">Density testing was performed using a Troxler nuclear gauge (#3430, serial #29588).</span> <span style="font-family: arial, helvetica, sans-serif;">Density testing result:</span> <span style="font-family: arial, helvetica, sans-serif;">P6 proctor-118.9@12.8%</span> <span style="font-family: arial, helvetica, sans-serif;"><strong>Grass area located to the Northwest of E-2 to E-3:</strong></span> <span style="font-family: arial, helvetica, sans-serif;">T1-elevation -2' below final grade, Location: 40' west of E-2, P6, Yd 110.7, M%14.9, Compaction: 93.1%</span> <span style="font-family: arial, helvetica, sans-serif;">T2-elevation -6' below final grade, Location: 51' Northwest of E-3, P6, Yd 116.6, M%15.3, Compaction: 98%</span> <span style="font-family: arial, helvetica, sans-serif;">T3-elevation -4' below final grade, Location: 76' North of E-2, P6, Yd 113.6, M%12, Compaction: 95.5%</span> <span style="font-family: arial, helvetica, sans-serif;"><strong>Along E line, E-2 to E-5:</strong></span> <span style="font-family: arial, helvetica, sans-serif;">T4-elevation -7.6' below final grade, Location: 54' East of E-4, P6, Yd 108.5, M%13.2, Compaction: 91.3%</span> <span style="font-family: arial, helvetica, sans-serif;">T5-elevation -10' below final grade, Location: 145' East of E-4, P6, Yd 108.7, M%13, Compaction: 91.4%</span> <span style="font-family: arial, helvetica, sans-serif;">T6-elevation -9.5' below final grade, Location: 45' west of E-5, P6, Yd 111, M%14, Compaction: 93.4%</span> <span style="font-family: arial, helvetica, sans-serif;">T7-elevation -2' below final grade, Location: 40' west of E-2, P6, Yd 110.7, M%14.9, Compaction: 93.1%</span> <span style="font-family: arial, helvetica, sans-serif;"><strong>Contractor continued work in infield grass area located to the west of A9</strong></span> <span style="font-family: arial, helvetica, sans-serif;">Density testing result:</span> <span style="font-family: arial, helvetica, sans-serif;">P6 proctor-118.9@12.8%</span> <span style="font-family: arial, helvetica, sans-serif;">T8-elevation -3.3' below final grade, Location: 156' west of A9, P6, Yd 108.3, M%11.6, Compaction: 91%</span> <span style="font-family: arial, helvetica, sans-serif;">T9-elevation -6.5' below final grade, Location: 81' Southwest of A9, P6, Yd 111.8, M%10.1, Compaction: 94%</span> <span style="font-family: arial, helvetica, sans-serif;">T10-elevation -6.1' below final grade, Location: 40' South of A9, P6, Yd 107.2, M%14.5, Compaction: 90.2%</span> <span style="font-family: arial, helvetica, sans-serif;">T11-elevation -4' below final grade, Location: 45' North of A9, P6, Yd 108.3, M%11.6, Compaction: 91%</span> <span style="font-family: arial, helvetica, sans-serif;">T12-elevation -3.3' below final grade, Location: 85' Northwest of A9, P6, Yd 110.8, M%11.1, Compaction: 93.2%</span> <span style="font-family: arial, helvetica, sans-serif;">T13-elevation -3.3' below base grade, between A9 and I3 P6, Yd 108.1, M%13.7, Compaction: 91%</span>
Upload Images
Image
Description
1
2
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel