Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C002(Runway 9L End Around Taxiway)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
nick.smith@asec-na.com (Nick Smith)
Observations/Finding
Summary
*
8/17/22 As requested by CWM James Higgins, the site was visited by our AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Site Observations: Contractor continued work on H-Line, the NE end of the taxiway, the Localizer, backfill outside SIDA by Crosswinds Rd., and the area around the A8 structure. Fill was placed and compaction testing requested. A proof-roll of the area just east of Zone 4, south of the Localizer was performed. No severe pumping and/or rutting was observed. A 12" lift of boulder fill was placed in the ravine east of Zone 4 to stabilize the subgrade. The area still displayed slight movement so one more lift was placed. Density testing was performed using a Troxler nuke gauge (#3430, serial #29588). Density testing results: P3 Moisture Density Relationship (proctor) - 118.8 @ 13.0 P2 Moisture Density Relationship (proctor) - 141.4 @ 5.7 T1 - elevation 1008.8, localizer pad south side, P3, DD 113.5, M% 12.9, compaction 95.5% T2 - elevation 1008.8, localizer pad north side, P3, DD 111.6, M% 13.9, compaction 94.0% T3 - elevation 1008.0, 50' east of localizer pad, P3, DD 111.3, M% 14.0, compaction 93.7% T4 - elevation 1008.0, 75' SE of pad, P3, DD 112.0, M% 13.4, compaction 94.3% T5 - elevation 1001.5, 20' south of A8, P3, DD 108.6, M% 12.4, compaction 91.4% T6 - elevation 1001.5, 50' south of A8, P3, DD 108.8, M% 13.7, compaction 91.6% T7 - elevation 1002.0, 40' east of H1, P3, DD 108.0, M% 12.8, compaction 90.9% T8 - elevation 1002.2, 5' south of H2, P3, DD 110.5, M% 13.3, compaction 93.0% T9 - elevation 1002.5, 10' west of H3, P3, DD 111.3, M% 12.5, compaction 93.7% T10 - Outside SIDA fence by crosswinds rd, P2, DD 131.3, M% 2.8, compaction 92.8% T11 - Outside SIDA fence by crosswinds rd, P2, DD 134.2, M%3.1, compaction 94.9%
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel