Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C002(Runway 9L End Around Taxiway)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
nick.smith@asec-na.com (Nick Smith)
Observations/Finding
Summary
*
8/16/22 As requested by CWM James Higgins, the site was visited by our AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Site Observations: The cContractor continued work on H-Line, Localizer, and backfill outside the SIDA fence over water lines, and the area around the A8 structure. Fill was placed and compaction testing requested. A proof-roll of the area just east of Zone 4 south of the localizer at the north end of area was performed. No severe pumping and/or deflection was noted. A moisture content check of the Sullivan Rd stockpile displayed a moisture content of 13.2%. Observed contractor placing filter fabric in a deep ravine under the taxiway before placing riprap. Density testing was performed using a Troxler nuke gauge (#3430, serial #29588). Density testing results: P3 Moisture Density Relationship (proctor) - 118.8 @ 13.0 P2 Moisture Density Relationship (proctor) - 141.4 @ 5.7 T1 - elevation 3' above water line, Over water line STA 104+05, P3, DD 112.0, M% 12.0, compaction 94.3% T2 - elevation 3' above water line, Over water line STA 106+50, P3, DD 109.7, M% 14.1, compaction 92.3% T3 - elevation 3' above water line, Over water line STA 107+00, P3, DD 109.8, M% 12.9, compaction 92.4% T4 - elevation 3' above water line, Over water line STA 103+50, P3, DD 114.0, M% 11.0, compaction 96.0% T5 - elevation 1008.5, localizer, P3, DD 107.7, M% 15.5, compaction 90.7% T6 - outside SIDA fence at Crosswinds Rd/Airport Blvd, P2, DD 127.5, M% 2.3, compaction 90.2%
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel