Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C002(Runway 9L End Around Taxiway)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
nick.smith@asec-na.com (Nick Smith)
Observations/Finding
Summary
*
9/23/22 As requested by CWM James Higgins, the site was visited by our AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Site Observations: Contractor continued work on the taxiway area from STA 4010+00 to STA 408+00. Fill was placed and compaction testing was requested. Density testing was performed using a Troxler nuke gauge (#3430, serial #29588). Density testing results: P3 Moisture Density Relationship (proctor) - 118.8 pcf @ 13.0% T1 - elevation 999.5, STA 409+00 center, P3, DD 118.3, M% 9.3, compaction 99% T2 - elevation 999.5, STA 409+00 south, P3, DD 116.5, M% 10.2, compaction 98% T3 - elevation 992.0, STA 408+00 center, P3, DD 108.9, M% 15.5, compaction 91.7% Material that was placed after these tests was coming in wet, recommended to contractor to wait for morning shift to dry out material to continue placing.
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel