Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C002(Runway 9L End Around Taxiway)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
rasheen.biggins@asec-na.com (Rasheen Biggins)
Observations/Finding
Summary
*
As requested, our ASEC representative arrived on site to observe site activities. The contractor wanted to start placing fill in STA 408+20 to STA 408+60 of Phase 4 of the taxiway. Density tests were taken during the procedure and can be found in the attached density report. Density tests were also taken on STA 403+25 to STA 406+20. Following successful compaction results, the contractor then began to place fill in the STA 408+20 area of the taxiway and southern shoulder of the taxiway at STA 408+20 to STA 409+20. Density testing was then performed following compaction of this lift. Density test results were found to meet job specifications for STA 408+20 in the taxiway. The soil placed on the shoulder were found to have higher than normal moisture contents which resulted in failing density tests. QC and ASEC recommended that the contractors open up this shoulder area approximately 1ft in depth to allow aeration. The contractor then placed the final lift for the day.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel