Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C060(Suncity - Peachtree)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Observations/Finding
Summary
*
As requested, an ASEC technician was present at the above-referenced site to conduct a slab-on-grade and perimeter slab footing inspection for Lots #86, 87, Pod 17, and Lot #84, Pod 15. Slab reinforcement appeared to consist of #4 rebar rested on three 3″ rod chairs spaced at approximately six 6″ inches on center. The bottom of the slab was covered with continuous poly vapor barrier lapping with wire mesh placed one 1″ from the bottom of the slab. Slab reinforcement preparations appeared to be in accordance with project specifications for size, spacing and quantity. The footing evaluation was performed by visual inspection, hand probing, and dynamic cone penetrometer (DCP) testing. During the evaluation, well-compacted fill soils were encountered underlain by residual soils. These soils were found to be suitable utilizing an allowable soil bearing pressure of 2,000 psf. The footings depth and width have been prepared in accordance with IRC 2012 and the Georgia Amendments. Lot #86, 87, Pod 17, and Lot #84, Pod 15 was found to be ready for concrete placement. The superintendent has been notified of these findings.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel