Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C002(Runway 9L End Around Taxiway)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
nick.smith@asec-na.com (Nick Smith)
Observations/Finding
Summary
*
As requested, the site was visited by the AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were noted on site this day. Site Observations: <ul> <li>Density testing was performed using a Troxler nuclear gauge ( #3430, serial #29588).</li> <li>H-Line from H1 to H3 Placement of fill was tested and the results are in the attached density test report.</li> <li>Taxiway shoulder and Taxiway Placement of fill was tested and the results are in the attached density test report.</li> <li>M-Line between M2 to M3 Placement of fill was tested and the results are in the attached density test report.</li> <li>Settlement plate was installed south of localizer pad.</li> </ul>
Upload Images
Image
Description
1
Settlement plate
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel