Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Concrete Test Report
Density test report
Date
*
Project Number
*
2023C111(DOA Fiber Infrastructure Improvements )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Isaac Davis (Isaac Davis)
Sample Info
Number of Sets
Samples Cast Per Set
Compliance
Field placement of concrete appeared to be in general accordance with the project specifications (i.e., slump, temperature, etc.) (refer to remarks below)
Yes
No
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Yes
No
Field Curing Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remark
Once arrived at the project for the concrete placement, I followed up on another observation of project to make sure everything was still acceptable. When the testing was completed, the Air was not in compliance with specifications. I discussed with the contractor about the air not falling into specification. On the second load another Air check was completed, and the air came up to 1.3%. The contractor was informed as well of the air not being in compliance with specifications. slump: 4.75 air: 2.5% temp: 63 unit weight: 144.4 pcf air re-check: 1.3 %
ASEC Sets
1
Field & Lab Data
ASEC Set ID
Laboratory Number
Date Sampled
Time Sampled
Sampled By
Isaac Davis (Isaac Davis)
Contractor
Concrete Supplier
Truck Number
Ticket Number
Mix ID
Specified Strength (psi)
Time Batched
Quantity of Load (cu. yd.)
Location of Placement
Plastic Properties
Ambient Temperature (°f)
Concrete Temperature(°f)
Slump (in.)
Air Content (%)
Water Added (gal.)
Test Results
1
Specimen No.
Scheduled Test Date
Date Tested
Age (days)
Avg. Dimension (in.)
X-Section (in²)
Max Load (lbs.)
Compressive Strength (psi)
Type Of Fracture
- Select -
Type 1
Type 2
Type 3
Type 4
Type 5
Type 6
Percentage Design Strength (%)
2
Specimen No.
Scheduled Test Date
Date Tested
Age (days)
Avg. Dimension (in.)
X-Section (in²)
Max Load (lbs.)
Compressive Strength (psi)
Type Of Fracture
- Select -
Type 1
Type 2
Type 3
Type 4
Type 5
Type 6
Percentage Design Strength (%)
3
Specimen No.
Scheduled Test Date
Date Tested
Age (days)
Avg. Dimension (in.)
X-Section (in²)
Max Load (lbs.)
Compressive Strength (psi)
Type Of Fracture
- Select -
Type 1
Type 2
Type 3
Type 4
Type 5
Type 6
Percentage Design Strength (%)
4
Specimen No.
Scheduled Test Date
Date Tested
Age (days)
Avg. Dimension (in.)
X-Section (in²)
Max Load (lbs.)
Compressive Strength (psi)
Type Of Fracture
- Select -
Type 1
Type 2
Type 3
Type 4
Type 5
Type 6
Percentage Design Strength (%)
5
Specimen No.
Scheduled Test Date
Date Tested
Age (days)
Avg. Dimension (in.)
X-Section (in²)
Max Load (lbs.)
Compressive Strength (psi)
Type Of Fracture
- Select -
Type 1
Type 2
Type 3
Type 4
Type 5
Type 6
Percentage Design Strength (%)
6
Specimen No.
Scheduled Test Date
Date Tested
Age (days)
Avg. Dimension (in.)
X-Section (in²)
Max Load (lbs.)
Compressive Strength (psi)
Type Of Fracture
- Select -
Type 1
Type 2
Type 3
Type 4
Type 5
Type 6
Percentage Design Strength (%)
1
Specimen No.
Scheduled Test Date
Date Tested
Age (days)
Avg. Dimension (in.)
X-Section (in²)
Max Load (lbs.)
Compressive Strength (psi)
Type Of Fracture
- Select -
Type 1
Type 2
Type 3
Type 4
Type 5
Type 6
Percentage Design Strength (%)
Add Specimen
1
Field & Lab Data
ASEC Set ID
Laboratory Number
Date Sampled
Time Sampled
Sampled By
Contractor
Concrete Supplier
Truck Number
Ticket Number
Mix ID
Specified Strength (psi)
Time Batched
Quantity of Load (cu. yd.)
Location of Placement
Plastic Properties
Ambient Temperature (°f)
Concrete Temperature(°f)
Slump (in.)
Air Content (%)
Water Added (gal.)
Test Results
1
Specimen No.
Scheduled Test Date
Date Tested
Age (days)
Avg. Dimension (in.)
X-Section (in²)
Max Load (lbs.)
Compressive Strength (psi)
Type Of Fracture
- Select -
Type 1
Type 2
Type 3
Type 4
Type 5
Type 6
Percentage Design Strength (%)
Add Specimen
Add New Set
Post Status custom
Validate Email